中文English

Cooperative OA office system

ABOUT US

ABOUT US

Founded in 1975, Guangzhou Water Conservancy & Hydropower Station Construction Engineering Co., Ltd. has become a national high-tech enterprise with the following qualifications, namely, a Grade-1 general contractor of construction of hydraulic and hydroelectric engineering, a Grade-1 general contractor of construction ofmunicipal public engineering, a Grade-2 general contractor of building construction engineering, a Grade-3 general contractor of construction of electric power engineering, a Grade-3 specialist contractor of power transmission and distribution projects, a Grade-3 specialist contractor of environmental protection engineering and a Grade-3 specialist contractor of river & lake renovating projects, etc.. As a building enterp...

ENGINEERING

ENGINEERING

  • BT project of extension project of Guan ...
    The general investment estimate for the extension project of the Guan Shan grand pump station is 82 million 560 thousand yuan, and the construction of the BT model is adopted. The scale for the 2 diameter 2.9 meters vertical type axial-flow pump. It
    2016-03-31
    View Details
  • Zhanjiang City Mulberry River Road five ...
    Zhanjiang City Mulberry River Road five road reconstruction project, including Mulberry River Road South, Kang Ning Lu, Kang Shun, Yuejin Road Zhongshan Road, five road. It is divided into five single projects, independent acceptance, separate repurc
    2016-04-10
    View Details
  • Lixi Barrage Consolidation and Reconstru...
    Lixi Barrage is one ofcascade development projects for Liuxi River. Located at the junction between Lixi Village, Huadong Town, Huadu District on the lower reach of this River and Zhuliao Town of Baiyun District, it is multi-purpose hydro-engineering
    2016-03-31
    View Details
  • Guangzhou City Creek silt centralized di...
    Tertiary sludge solidification technology is based on the physical properties and chemical composition of the sludge, using a suitable curing agent and process the effluent sludge harmless treatment, and the curing method for different materials, it
    2016-04-11
    View Details
  • 01

    BT project of extension project of Guan ...

  • 02

    Zhanjiang City Mulberry River Road five ...

  • 03

    Lixi Barrage Consolidation and Reconstru...

  • 04

    Guangzhou City Creek silt centralized di...

NEWS

NEWS

Chongyang Festival Activity in 2017...

In October, the Double Ninth Festival, march. At 9:00 on the morning of October 27, 2017, the trade union and the group of Hydropower Construction Engineering Co. Ltd. Guangzhou branch organized the "passionate Yongpangaofeng" of Baiyun Mountain clim

View Detail

View More

CULTURE

CULTURE

幸运快3计划走势图怎么看 北京赛车人工计划 河南快3历史结果 江西多乐彩出号 炒股380万剩60万破产 优发娱乐官网手机网页版 股票指数意义 上海快三走势图今天 宁夏11选5哪里可以投注 广西快三走势图手机版 江西11选5基本走势图360